All Systems Operational

About This Site

We continuously monitor the status of the Blockdaemon.com and all related services. If there are any interruptions in our service, an incident will be raised here.

Blockdaemon Website Operational
Blockdaemon App Operational
Ubiquity API Operational
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Scheduled Maintenance
Update - We will be undergoing scheduled maintenance during this time.
Mar 16, 2023 - 04:47 UTC
Scheduled - Blockdaemon will update Ethereum (Geth) Goerli nodes to v1.11.4 on 03/23/23. We are updating our nodes due to a release from the Ethereum foundation. This update applies to all Blockdaemon Geth Goerli nodes, there will be planned downtime of up to 5 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than those mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here
https://github.com/ethereum/go-ethereum/releases/tag/v1.11.4

Mar 14, 2023 - 06:10 UTC
Blockdaemon Website Uptime
Fetching
Blockdaemon App Uptime
Fetching
Ubiquity API Uptime
Fetching
Past Incidents
Mar 23, 2023

No incidents reported today.

Mar 22, 2023
Completed - The scheduled maintenance has been completed.
Mar 22, 21:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 22, 20:00 UTC
Scheduled - Blockdaemon will update Near protocol to 1.32.0 on 03/22/2023. We are updating our nodes due to a release from the Near Foundation. This update applies to all Blockdaemon Near mainnet nodes, there will be planned downtime of up to 10 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than those mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here
https://github.com/near/nearcore/releases/tag/1.32.0

Mar 22, 19:54 UTC
Completed - The scheduled maintenance has been completed.
Mar 22, 10:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 22, 08:00 UTC
Scheduled - Blockdaemon will update Cardano nodes to v1.35.6 on 03/22/23. We are updating our nodes due to a release from the Cardano foundation. This update applies to all Blockdaemon Cardano nodes, there will be planned downtime of up to 5 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here https://github.com/input-output-hk/cardano-node/releases/tag/1.35.6.

Mar 17, 11:06 UTC
Completed - The scheduled maintenance has been completed.
Mar 22, 09:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 22, 08:00 UTC
Scheduled - Blockdaemon will update XRP Testnet and Mainnet nodes to v1.10.0 on 03/22/23. We are updating our nodes due to a release from the XRP foundation. This update applies to all Blockdaemon XRP nodes, there will be planned downtime of up to 30 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here https://github.com/XRPLF/rippled/releases/tag/1.10.0.

Mar 17, 12:53 UTC
Mar 21, 2023
Completed - The scheduled maintenance has been completed.
Mar 21, 09:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 21, 08:00 UTC
Scheduled - Blockdaemon will update Tezos nodes to Octez v16.0 on 03/21/23. We are updating our nodes due to a release from the Tezos foundation. This update applies to all Blockdaemon Tezos nodes, there will be planned downtime of up to 5 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here https://tezos.gitlab.io/releases/version-16.html.

Mar 16, 10:05 UTC
Mar 20, 2023
Completed - The scheduled maintenance has been completed.
Mar 20, 20:01 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 20, 16:00 UTC
Scheduled - Blockdaemon will update Skale mainnet nodes to v.2.1 on 03/20/2023. We are updating our nodes due to a release from the Skale foundation. This update applies to all Blockdaemon Skale mainnet nodes, there will be planned downtime of up to 30 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than those mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

Mar 20, 15:20 UTC
Completed - The scheduled maintenance has been completed.
Mar 20, 16:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 20, 13:00 UTC
Scheduled - Blockdaemon will update ETH2 Nimbus nodes to v23.3.1 on 3/20/23. We are updating our nodes due to a release from the Ethereum foundation. This update applies to all Blockdaemon ETH2 Nimbus nodes

We have tested the release and do not anticipate any downtime as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here
https://github.com/status-im/nimbus-eth2/releases/tag/v23.3.1

Mar 16, 05:21 UTC
Completed - The scheduled maintenance has been completed.
Mar 20, 09:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 20, 08:00 UTC
Scheduled - Blockdaemon will update Zcash testnet and mainnet nodes to v5.4.2 on 03/20/23. We are updating our nodes due to a release from the Zcash foundation. This update applies to all Blockdaemon Zcash testnet and mainnet nodes, there will be planned downtime of up to 15 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here https://github.com/zcash/zcash/releases/tag/v5.4.2.

Mar 15, 10:25 UTC
Mar 19, 2023

No incidents reported.

Mar 18, 2023

No incidents reported.

Mar 17, 2023
Completed - The scheduled maintenance has been completed.
Mar 17, 19:20 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 17, 17:20 UTC
Scheduled - Blockdaemon will update Evmos testnet nodes to 12.0.0-rc-4 on 03/17/2022 We are updating our nodes due to a release from the Evmos foundation. This update applies to all Blockdaemon evmos testnet nodes.

We have tested the release and do not anticipate any downtime as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here

https://github.com/evmos/evmos/releases/tag/v12.0.0-rc4

Mar 17, 16:52 UTC
Completed - The scheduled maintenance has been completed.
Mar 17, 14:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 17, 10:00 UTC
Scheduled - Blockdaemon will update Elrond protocol nodes to v1.4.14.0 on 3/17/23. We are updating our nodes due to a release from the Elrond foundation. This update applies to all Blockdaemon Elrond nodes.

We have tested the release and do not anticipate any downtime as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here
https://github.com/multiversx/mx-chain-go/releases/tag/v1.4.14

Mar 16, 21:37 UTC
Completed - The scheduled maintenance has been completed.
Mar 17, 13:15 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 17, 12:15 UTC
Update - We will be undergoing scheduled maintenance during this time.
Mar 15, 19:05 UTC
Scheduled - Blockdaemon will update Stride mainnet nodes to v7.0.0 on 03/17/23. We are updating our nodes due to a release from Stride Labs. This update applies to all Blockdaemon Stride mainnet nodes.
We have tested the release and do not anticipate any downtime as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here
https://github.com/Stride-Labs/stride/releases/tag/v7.0.0

Mar 15, 19:04 UTC
Mar 16, 2023
Completed - The scheduled maintenance has been completed.
Mar 16, 19:45 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 16, 15:45 UTC
Scheduled - Blockdaemon will update Osmosis mainnet nodes to v15.0.0 on 03/16/23. We are updating our nodes due to a release from the Osmosis foundation. This update applies to all Blockdaemon Osmosis Mainnet nodes, there will be planned downtime of up to 30 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than those mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here
https://github.com/osmosis-labs/osmosis/releases/tag/v15.0.0

Mar 13, 18:47 UTC
Completed - The Solana Testnet Restart was completed late last night and reached super majority this morning at 08:50am UTC. The Solana Testnet network is now restored.
Mar 16, 09:30 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 15, 15:00 UTC
Scheduled - Blockdaemon have been informed by the Solana Foundation that the Testnet cluster will likely go offline today and operators will need to prepare for a restart of the network.
If this happens, we expect the cluster to go offline at approximately 03:00pm UTC. We are currently unaware how long it will take for the restart to gain super majority and come back online.
Once we know more, we will send out further updates.

Mar 15, 10:18 UTC
Mar 15, 2023
Completed - The scheduled maintenance has been completed.
Mar 15, 12:31 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 15, 09:00 UTC
Scheduled - The Q1 Stellar Testnet reset is scheduled for March 15, 2023 at 0900 UTC. This will result in downtime for the Testnet network. This applies to all Blockdaemon Stellar Testnet nodes, there will be planned downtime of up to 5 hours while the Testnet reset occurs.

If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please visit the Stellar status page https://status.stellar.org/ .

Mar 8, 16:48 UTC
Completed - The scheduled maintenance has been completed.
Mar 15, 11:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 15, 08:00 UTC
Scheduled - Blockdaemon will update Cosmos nodes to v.9.0.0 on 3/15/23. We are updating our nodes due to a release from the Cosmos foundation. This update applies to all Blockdaemon Cosmos Mainnet nodes, there will be planned downtime of up to 30 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here https://github.com/cosmos/gaia/releases/tag/v9.0.0

Feb 24, 18:00 UTC
Mar 14, 2023
Completed - The scheduled maintenance has been completed.
Mar 14, 17:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 14, 13:00 UTC
Scheduled - Blockdaemon will update Ethereum (Geth) Goerli Testnet nodes to v1.11.3 on 03/14/23. We are updating our nodes due to a release from the Ethereum foundation. This update applies to all Blockdaemon Geth Goerli testnet nodes, there will be planned downtime of up to 5 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than those mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here
https://github.com/ethereum/go-ethereum/releases/tag/v1.11.3

Mar 9, 15:42 UTC
Completed - The scheduled maintenance has been completed.
Mar 14, 17:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 14, 13:00 UTC
Scheduled - Blockdaemon will update Ethereum (Prysm) Goerli Testnet nodes to v3.2.2 on 03/14/23. We are updating our nodes due to a release from the Ethereum foundation. This update applies to all Blockdaemon Prysm Goerli testnet nodes, there will be planned downtime of up to 5 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than those mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here
https://github.com/prysmaticlabs/prysm/releases/tag/v3.2.2-rc.3

Mar 9, 15:46 UTC
Mar 13, 2023
Completed - The scheduled maintenance has been completed.
Mar 13, 12:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 13, 11:00 UTC
Scheduled - Blockdaemon will update Polkadot Westend, Kusama and Mainnet nodes to v0.9.39-1 on 03/13/23. We are updating our nodes due to a urgent release from the Web3 foundation. This update applies to all Blockdaemon Polkadot Westend, Kusama and Mainnet nodes, there will be planned downtime of up to 5 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here https://github.com/paritytech/polkadot/releases/tag/v0.9.39.

Mar 9, 18:52 UTC
Completed - The scheduled maintenance has been completed.
Mar 13, 09:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 13, 08:00 UTC
Scheduled - Due to unforeseen circumstances, the Litecoin release did not go ahead as planned this morning. We apologise for the miscommunication. Blockdaemon will update Litecoin Testnet and Mainnet nodes to v0.21.2.2 on 03/13/23. We are updating our nodes due to a release from the Litecoin foundation. This update applies to all Blockdaemon Litecoin Testnet and Mainnet nodes, there will be planned downtime of up to 10 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here https://github.com/litecoin-project/litecoin/releases/tag/v0.21.2.2.

Mar 9, 10:12 UTC
Completed - The scheduled maintenance has been completed.
Mar 13, 05:42 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 13, 04:42 UTC
Scheduled - Blockdaemon will update Juno nodes to v.13.0.0 on 3/13/23. We are updating our nodes due to a release from the Juno foundation. This update applies to all Blockdaemon Juno Mainnet nodes, there will be planned downtime of up to 20 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than those mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here https://github.com/CosmosContracts/juno/releases/tag/v13.0.0

Mar 7, 05:05 UTC
Mar 12, 2023

No incidents reported.

Mar 11, 2023

No incidents reported.

Mar 10, 2023
Completed - The scheduled maintenance has been completed.
Mar 10, 19:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 10, 15:00 UTC
Scheduled - Blockdaemon will update Celo Mainnet nodes to v.1.7.2 on 03/10/23. We are updating our nodes due to a release from the Celo foundation. This update applies to all Blockdaemon Celo Mainnet nodes, there will be planned downtime of up to 30 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than those mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here
https://github.com/celo-org/celo-blockchain/releases/tag/v1.7.2

Mar 8, 22:50 UTC
Completed - The scheduled maintenance has been completed.
Mar 10, 14:01 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 10, 13:00 UTC
Update - We will be undergoing scheduled maintenance during this time.
Mar 7, 10:21 UTC
Scheduled - Blockdaemon will update Moonbeam Alphanet & Mainnet nodes to v0.30.0 on 03/10/23. We are updating our nodes due to a release from the Moonbeam foundation. This update applies to all Blockdaemon Moonbeam Alphanet & Mainnet nodes, there will be planned downtime of up to 5 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here https://github.com/PureStake/moonbeam/releases/tag/v0.30.0.

Mar 7, 10:21 UTC
Completed - The scheduled maintenance has been completed.
Mar 10, 14:01 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 10, 13:00 UTC
Scheduled - Blockdaemon will update Polkadot Westend, Kusama and Mainnet nodes to v0.9.39 on 03/10/23. We are updating our nodes due to a release from the Web3 foundation. This update applies to all Blockdaemon Polkadot Westend, Kusama and Mainnet nodes, there will be planned downtime of up to 5 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here https://github.com/paritytech/polkadot/releases/tag/v0.9.39.

Mar 7, 09:11 UTC
Mar 9, 2023
Completed - The scheduled maintenance has been completed.
Mar 9, 12:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 9, 10:00 UTC
Scheduled - Blockdaemon will downgrade Solana Testnet nodes to v1.14.6 on 03/09/23. We are downgrading our nodes due to a release from the Solana foundation as part of the ongoing efforts to stabilize v1.14. This downgrade applies to all Blockdaemon Solana Testnet nodes, there will be planned downtime of up to 5-10 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here https://github.com/solana-labs/solana/releases/tag/v1.14.16.

Mar 6, 12:40 UTC
Completed - Unfortunately due to unforeseen circumstances, this release did not go ahead today. Apologies for the delayed notification. We will update with a new release timeline shortly.
Mar 9, 10:00 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 9, 08:01 UTC
Scheduled - Blockdaemon will update Litecoin Testnet and Mainnet nodes to v0.21.2.2 on 03/09/23. We are updating our nodes due to a release from the Litecoin foundation. This update applies to all Blockdaemon Litecoin Testnet and Mainnet nodes, there will be planned downtime of up to 10 minutes per node.

We have tested the release and do not anticipate any unexpected downtime other than mentioned above as a result of the update. If you have any questions or concerns please reach out to your Technical Account Manager.

If you want additional information please review the release notes here https://github.com/litecoin-project/litecoin/releases/tag/v0.21.2.2.

Mar 6, 12:46 UTC